PROJECTS​

BAE TITAN DRYDOCK

BAE TITAN DRYDOCK

Preservation of 1,000,000 square feet including freeboard, underwater hull and tanks. Delivered on time during a shortened availability by finding creative solutions to complex logistics and production problems.

USS BENFOLD MATERIAL

USS BENFOLD MATERIAL

Blasted and coated 56 foundations for installation aboard the USS Benfold.  The pieces were prefabricated in Norfolk, VA, preserved, and then delivered to Japan for shipboard installation.

ARMY LCU

ARMY LCU-2023

Full preservation of exterior, decks, superstructure, tanks and machinery spaces. Tested new epoxy-polysiloxane coating system on exterior surfaces for Sherwin Williams.
 

GENERAL DYNAMICS SPEEDE DRYDOCK _

GENERAL DYNAMICS SPEEDE DRYDOCK ​

Complete freeboard preservation while still in the water using UHP blasting robots and floating work platforms